KNR Constructions’ Bridge Project Analyzed
KNR Constructions has been officially chosen to build a new bridge across the Mir Alam Tank in Bengaluru. This important project is being funded by the Musi Riverfront Development Corporation. The total cost of the bridge, including all the planning and work, is approximately 319.24 billion rupees, and it should be completed within 24 months.
- KNR Constructions won the bridge contract.
- Project cost: Rs 319.24 billion (excluding GST).
- Bridge connects Bengaluru Highway to Chintalmet.
- Construction timeframe: 24 months.
- EPC mode signifies full responsibility for KNR.
- Significant infrastructure investment in Bengaluru region.
Understanding the Project’s Significance
This bridge represents a major investment in Bengaluru’s infrastructure. It’s designed to improve transportation links between the Bengaluru National Highway and the Chintalmet area. The Engineering, Procurement, and Construction (EPC) model means KNR Constructions is responsible for the entire project, from starting the work to finishing it, offering more predictability for the Musi Riverfront Development Corporation.
The bridge project promises significant improvements to Bengaluru’s connectivity and overall infrastructure.



